SH STUDIO Custom Metal Detailing Parts for Energy Cable, Piping & Hose for Gundam & Zaku
- Regular price
- RM 14.00
- Sale price
- RM 14.00
- Regular price
-
RM 15.00
Share
Product Name : Metal Piping Hose by SH STUDIO
S set
■ Size:3.0mm x 3.0mm x 2.0mm
■ Content:Piping / Hose*20pcs ,Spring (120mm)*1pcs,Shaping tube130mm)*1pcs
M set
■ Size :4.0mm x 4.0mm x 2.5mm。
■ Content:Piping / Hose*20pcs ,Spring (150 mm)*1pcs,Shaping tube (150mm)*1pcs
L set
■ Size :4.9mm x 4.5mm x 3.3mm。
■ Content:Piping / Hose*20pcs ,Spring (200 mm)*1pcs,Shaping tube (200mm)*1pcs
Before using : -
■ MG Zaku 2.0
The legs and waist need to use Power Tube L 40 pieces (2 bags). The waist needs to be shaped with a shaping tube, and the legs do not need to use a shaping tube. The head of MG Zaku needs to use 18 pieces of power tube M (1 bag), and the head also needs to use a shaping tube.
■ MG Sinanju
The waist needs to use power tube L 28-30 pieces
■ HG1: 144 Kshatriya
The waist requires 18 power tubes L.
■ 144 UC series Zaku
Use 16-18 power tubes S for the head, and use several M or L power tubes for the waist and legs. All require the use of shaping tubes.
■ BB UC series Zaku
Option 1: Use 20 power tubes L on the head and 18 power tubes M on the waist. All require the use of shaping tubes.
Option 2: Use 22 power tubes M on the head and 28 power tubes S on the waist. All require the use of shaping tubes.
■ RG Zaku
The head uses 18 power tube S (1 pack), and the waist and legs use several power tubes M32 (2 pack). Can directly replace the original plastic parts of the model.
Modelling skills required to apply this product to your beloved kits.
Please do enquire us if you have any question regarding to "how to apply metal part to your model kits"